Rough-In Appointment

Had our rough-in appointment today which went for almost an hour. Everything was where it was meant to be so no issue whatsoever.

Also had a good chat with our SS and he thoroughly walked us through what they will be doing for the next couple of weeks. Looks like we will hit lock up by end of September or there about.

Very impressed with our SS, he has great attention to detail and very open and honest with everything. He was happy for us to bring our independent inspector and told us to send him the report so he can go through it to make sure he hasn't missed anything. 

Our independent inspector was very impressed with the quality of work on our build. There was one or two very minor issue that needs to be address but besides that it was pretty much spot on.

Insulation and Gyprock will start next week, should be done by next Friday.

We are still targeting to get keys before christmas.