Sunday 25 September 2016

Fixout Completed - Lock Up

We were informed on Friday that our fix out has been completed. Meaning all architraves and internal doors have been put in and the front door has been locked and we no longer have access unless the tradies forgets to lock up.

Kitchen, Bathroom and Laundry cabinet has also been delivered and wet area has been waterproofed.

Finally get to see our Lin 1 doors in person and so glad we went with them as a feature item in our house. These doors still needs to be stained in Caoba. 


Double Sliding Lin 1 Home Theatre Doors

Butler Pantry Door (Left) Laundry Door (Right)
Front door
Bathroom Cabinets

Entry Hall Way + Amazing Wife
Kitchen, Laundry and ensuite cabinets