Internal painting is still going and looks like it will be done once the electrical fit out has been completed. External painting of down pipes, eaves and etc has been completed though.
We were onsite on Saturday morning and to our surprise a team of 5-6 electricians was on site doing our electrical fitout. Looks like all of the downlights has been installed by 11am.
Walk in Robe, butler pantry and linen shelving has also been installed. Our bathroom and ensuite benchtop has been installed. Our kitchen benchtop has been partially installed.